Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/alfaegecompany/public_html/wp-includes/functions.php on line 6114
Spor Kompleksi – Alfa Ege Company

Spor Kompleksi

Tarih
05 – 2006 | 01 – 2008
Yer
Iraq, Erbil (Kesnazan)
Proje Adı
Spor Kompleksi
Proje Sahibi
Alfa Ege Company
  • Spor Kompleksi / Isıtma, Soğutma, Klima, Havuz Isıtma, Yangın Sıhhi Tesisat İşleri
  • Havalandırma Kanalları İmalat ve Montajı
  • Kazan Dairesi Gruplama İşleri
Zetyazilim Zetyazılım Tarafından Hazırlanmıştır.